| 07:50 AM |
MO-3312 · VRF Outdoor Unit |
MO RELEASED |
BOM-VRF-08 (46 line items) |
Explode BOM & Reserve Stock |
Assembly Line 2 |
CREATE MATERIAL KIT TICKET |
MO Released |
HIGH |
OPEN |
| 08:15 AM |
MO-3298 · Copper Coil Assembly |
KIT ISSUE |
BOM-COIL-14 — copper tube 22mm SHORT: 40m |
Flag Shortage — Raise MR |
Fabrication Bay 1 |
SHORTAGE ESCALATION TICKET |
Kit Issue |
HIGH |
SHORTAGE |
| 08:40 AM |
MO-3301 · Solar Panel Frame |
KIT ISSUE |
BOM-FRAME-05 FULL KIT OK |
Issue Kit to Shopfloor |
Frame Shop |
GATE PASS / ISSUE SLIP TICKET |
Kit Issued |
MEDIUM |
PROCESSING |
| 09:05 AM |
MO-3287 · MCCB Panel Board |
SHOPFLOOR |
Assembly Op-40 — wiring & fitting |
Track Job Progress |
Electrical Assembly Line |
JOB PROGRESS TICKET |
In Production |
MEDIUM |
IN PROGRESS |
| 09:30 AM |
MO-3276 · Racking System |
WIP TRANSFER |
Welded frames → Paint Shop |
Move WIP Stage 2 → 3 |
Paint & Finishing |
WIP TRANSFER TICKET |
WIP In Transit |
LOW |
PROCESSING |
| 09:58 AM |
MO-3260 · Cable Tray Batch |
QC PENDING |
Dimensional & finish check |
Route to Quality Ticket |
QC Bay 1 |
QC INSPECTION TICKET |
QC Hold |
MEDIUM |
OPEN |
| 10:20 AM |
MO-3241 · Pump Housing |
FG HANDOVER |
QC passed — 120 units |
Handover to Finished Goods Store |
FG Store A |
FG HANDOVER TICKET |
FG Ready |
MEDIUM |
COMPLETED |